{"id":794,"date":"2024-03-12T10:34:06","date_gmt":"2024-03-12T10:34:06","guid":{"rendered":"https:\/\/eog-szkoly.zory.pl\/?p=794"},"modified":"2024-03-12T10:34:11","modified_gmt":"2024-03-12T10:34:11","slug":"its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed","status":"publish","type":"post","link":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/","title":{"rendered":"It&#8217;s brighter and cheaper &#8211; more work at Technical School No. 1 and Primary School No. 4 completed!"},"content":{"rendered":"<p>Work is still ongoing under the project entitled &#8220;Comprehensive actions to improve the energy efficiency of the buildings of Primary School No. 4 and Technical School No. 1 in \u017bory.&#8221; Technical School No. 1 already produces its own electricity thanks to a photovoltaic installation and in Primary School No. 4 is brighter thanks to the replacement of lighting.<\/p>\n<p>Agreement for the delivery and installation of a photovoltaic installation for Technical School No. 1. the name of Nicolaus Copernicus in \u017bory has already been completed and the institution can use clean energy and save money. Photovoltaic panels with a total capacity of 4,968 kWp along with power optimizers and an inverter were installed on the roof of the building. Reports were also made to the State Fire Service in \u017bory and Tauron, an annex to the contract with Tauron related to photovoltaics was signed and the installation has been in operation for several months and allows the school to reduce energy bills.<\/p>\n<p>There is also a lot going on in the building of Primary School No. 4 with Sports Departments and the Sports Championship the name of Otylia J\u0119drzejczak in \u017bory. The replacement of lighting fixtures in teaching rooms and the gymnasium has already been completed. This makes it not only brighter, but also more economical!<\/p>\n<p>But that&#8217;s not all! A lot is happening both outside and inside the Primary School No. 4 building. A new central heating system has already been connected, the electrical installation has been replaced and plaster has been put on the walls. The walls and ceilings were also painted.<\/p>\n<p>The replacement of windows and window sills has already been completed and the external doors have also been replaced. The roof and walls of the building have been insulated which which are prepared for plaster application. The gutters were also replaced and the renovation of chimneys was completed.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-large wp-image-707\" src=\"https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-1024x195.jpg\" alt=\"\" width=\"800\" height=\"152\" srcset=\"https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-1024x195.jpg 1024w, https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-300x57.jpg 300w, https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-768x146.jpg 768w, https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3.jpg 1384w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p>The work was carried out as part of the project entitled &#8220;Comprehensive actions to improve the energy efficiency of buildings of Primary School No. 4 and Technical School No. 1 in \u017bory&#8221; for which the City of \u017bory received funding from the EEA Financial Mechanism 2014-2021 under the program: &#8220;Environment, Energy and Climate Change&#8221;, program area : Energy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work is still ongoing under the project entitled &#8220;Comprehensive actions to improve the energy efficiency of the buildings of Primary School No. 4 and Technical School No. 1 in \u017bory.&#8221; Technical School No. 1 already produces its own electricity thanks to a photovoltaic installation and in Primary School No. 4 is brighter thanks to the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-794","post","type-post","status-publish","format-standard","hentry","category-bez-kategorii"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>It&#039;s brighter and cheaper - more work at Technical School No. 1 and Primary School No. 4 completed! - Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"It&#039;s brighter and cheaper - more work at Technical School No. 1 and Primary School No. 4 completed! - Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach\" \/>\n<meta property=\"og:description\" content=\"Work is still ongoing under the project entitled &#8220;Comprehensive actions to improve the energy efficiency of the buildings of Primary School No. 4 and Technical School No. 1 in \u017bory.&#8221; Technical School No. 1 already produces its own electricity thanks to a photovoltaic installation and in Primary School No. 4 is brighter thanks to the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/\" \/>\n<meta property=\"og:site_name\" content=\"Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-12T10:34:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-12T10:34:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-1024x195.jpg\" \/>\n<meta name=\"author\" content=\"Adrian Lubszczyk\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Adrian Lubszczyk\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/\"},\"author\":{\"name\":\"Adrian Lubszczyk\",\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/#\\\/schema\\\/person\\\/5d2ab144690aabd01180adeeb6ee487c\"},\"headline\":\"It&#8217;s brighter and cheaper &#8211; more work at Technical School No. 1 and Primary School No. 4 completed!\",\"datePublished\":\"2024-03-12T10:34:06+00:00\",\"dateModified\":\"2024-03-12T10:34:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/\"},\"wordCount\":377,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/eog-3-1024x195.jpg\",\"articleSection\":[\"Bez kategorii\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/\",\"url\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/\",\"name\":\"It's brighter and cheaper - more work at Technical School No. 1 and Primary School No. 4 completed! - Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/eog-3-1024x195.jpg\",\"datePublished\":\"2024-03-12T10:34:06+00:00\",\"dateModified\":\"2024-03-12T10:34:11+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/#\\\/schema\\\/person\\\/5d2ab144690aabd01180adeeb6ee487c\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/eog-3-1024x195.jpg\",\"contentUrl\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/eog-3-1024x195.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Strona g\u0142\u00f3wna\",\"item\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"It&#8217;s brighter and cheaper &#8211; more work at Technical School No. 1 and Primary School No. 4 completed!\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/#website\",\"url\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/\",\"name\":\"Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/#\\\/schema\\\/person\\\/5d2ab144690aabd01180adeeb6ee487c\",\"name\":\"Adrian Lubszczyk\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/06942e2038e9978435f34b8b259995b5fa2ffdcf33148bd2bf1e732ebb1f87b8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/06942e2038e9978435f34b8b259995b5fa2ffdcf33148bd2bf1e732ebb1f87b8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/06942e2038e9978435f34b8b259995b5fa2ffdcf33148bd2bf1e732ebb1f87b8?s=96&d=mm&r=g\",\"caption\":\"Adrian Lubszczyk\"},\"url\":\"https:\\\/\\\/eog-szkoly.zory.pl\\\/en\\\/author\\\/adrlub\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"It's brighter and cheaper - more work at Technical School No. 1 and Primary School No. 4 completed! - Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/","og_locale":"en_US","og_type":"article","og_title":"It's brighter and cheaper - more work at Technical School No. 1 and Primary School No. 4 completed! - Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach","og_description":"Work is still ongoing under the project entitled &#8220;Comprehensive actions to improve the energy efficiency of the buildings of Primary School No. 4 and Technical School No. 1 in \u017bory.&#8221; Technical School No. 1 already produces its own electricity thanks to a photovoltaic installation and in Primary School No. 4 is brighter thanks to the [&hellip;]","og_url":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/","og_site_name":"Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach","article_published_time":"2024-03-12T10:34:06+00:00","article_modified_time":"2024-03-12T10:34:11+00:00","og_image":[{"url":"https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-1024x195.jpg","type":"","width":"","height":""}],"author":"Adrian Lubszczyk","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Adrian Lubszczyk","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/#article","isPartOf":{"@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/"},"author":{"name":"Adrian Lubszczyk","@id":"https:\/\/eog-szkoly.zory.pl\/#\/schema\/person\/5d2ab144690aabd01180adeeb6ee487c"},"headline":"It&#8217;s brighter and cheaper &#8211; more work at Technical School No. 1 and Primary School No. 4 completed!","datePublished":"2024-03-12T10:34:06+00:00","dateModified":"2024-03-12T10:34:11+00:00","mainEntityOfPage":{"@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/"},"wordCount":377,"commentCount":0,"image":{"@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/#primaryimage"},"thumbnailUrl":"https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-1024x195.jpg","articleSection":["Bez kategorii"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/","url":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/","name":"It's brighter and cheaper - more work at Technical School No. 1 and Primary School No. 4 completed! - Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach","isPartOf":{"@id":"https:\/\/eog-szkoly.zory.pl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/#primaryimage"},"image":{"@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/#primaryimage"},"thumbnailUrl":"https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-1024x195.jpg","datePublished":"2024-03-12T10:34:06+00:00","dateModified":"2024-03-12T10:34:11+00:00","author":{"@id":"https:\/\/eog-szkoly.zory.pl\/#\/schema\/person\/5d2ab144690aabd01180adeeb6ee487c"},"breadcrumb":{"@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/#primaryimage","url":"https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-1024x195.jpg","contentUrl":"https:\/\/eog-szkoly.zory.pl\/wp-content\/uploads\/2023\/09\/eog-3-1024x195.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/eog-szkoly.zory.pl\/en\/its-brighter-and-cheaper-more-work-at-technical-school-no-1-and-primary-school-no-4-completed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Strona g\u0142\u00f3wna","item":"https:\/\/eog-szkoly.zory.pl\/en\/"},{"@type":"ListItem","position":2,"name":"It&#8217;s brighter and cheaper &#8211; more work at Technical School No. 1 and Primary School No. 4 completed!"}]},{"@type":"WebSite","@id":"https:\/\/eog-szkoly.zory.pl\/#website","url":"https:\/\/eog-szkoly.zory.pl\/","name":"Kompleksowe dzia\u0142ania na rzecz poprawy efektywno\u015bci energetycznej budynk\u00f3w Szko\u0142y Podstawowej nr 4 i Technikum nr 1 w \u017borach","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eog-szkoly.zory.pl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/eog-szkoly.zory.pl\/#\/schema\/person\/5d2ab144690aabd01180adeeb6ee487c","name":"Adrian Lubszczyk","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/06942e2038e9978435f34b8b259995b5fa2ffdcf33148bd2bf1e732ebb1f87b8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/06942e2038e9978435f34b8b259995b5fa2ffdcf33148bd2bf1e732ebb1f87b8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/06942e2038e9978435f34b8b259995b5fa2ffdcf33148bd2bf1e732ebb1f87b8?s=96&d=mm&r=g","caption":"Adrian Lubszczyk"},"url":"https:\/\/eog-szkoly.zory.pl\/en\/author\/adrlub\/"}]}},"_links":{"self":[{"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/posts\/794","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/comments?post=794"}],"version-history":[{"count":1,"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/posts\/794\/revisions"}],"predecessor-version":[{"id":795,"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/posts\/794\/revisions\/795"}],"wp:attachment":[{"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/media?parent=794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/categories?post=794"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eog-szkoly.zory.pl\/en\/wp-json\/wp\/v2\/tags?post=794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}